Drafting a framework agreement involves two layers: the framework containing the fixed terms for the entire supply relationship, and a template for the detailed assignment used for concrete purchasing on a case-by-case basis. In the framework, you establish the parameters such as price, quality, delivery times, liability, and confidentiality; in the detailed assignment, you define the variable work. The greatest risk lies in the alignment between these two layers and, when dealing with multiple suppliers, in the way you distribute assignments. The framework is based on freedom of contract (Article 6:213 et seq. of the Dutch Civil Code), so you determine the content yourself within the limits of mandatory law.
The short answer
- Work in two layers: a window with fixed conditions and a model for the further commission.
- Explicitly state whether there is a purchase obligation; by default, there is none.
- Include a ranking rule so that it is clear which document takes precedence in the event of a conflict.
- Establish the allocation system for multiple suppliers: fixed ranking or mini-competition.
- Rules regarding price and indexation, quality and inspection, liability, term and termination.
- Agree on how ongoing assignments will be settled when the window ends.
Drafting a two-tier framework agreement
The core of a good framework agreement is the separation between what is fixed and what is variable. The fixed layer belongs in the framework: the general terms and conditions that apply to every order. The variable layer belongs in the detailed order: the quantity, the specification, the delivery date, and the location. Anyone who mixes the two must reconfirm the entire set of conditions for every order and actually loses the benefit of the framework contract.
Therefore, create a short standard format for the further assignment alongside the framework. This should only state what changes each time, with a reference to the framework for the rest. This keeps the call-off light yet legally comprehensive, as the stringent conditions are already covered in the framework.
The core provisions in the framework
The following topics belong in virtually every framework agreement:
- Subject matter and scope. Which types of products or services fall within the framework, and which expressly do not.
- Price and indexation. Fixed rates or tiered structures, plus a price adjustment arrangement over the term, for example, an annual index.
- Purchase obligation. Is there a minimum volume or exclusivity, or does the client remain completely free? This is the most important deciding factor.
- Quality and inspection. Specifications, inspection rights, and what happens in the event of rejection or defects.
- Delivery and delivery times. Standard delivery periods, response times, and the consequences of late delivery.
- Liability. A clear limitation per assignment and across the entire relationship, tailored to the risk.
- Confidentiality and intellectual property. Particularly relevant for custom work or sensitive data.
- Duration, renewal, and termination. With notice period and an arrangement for ongoing assignments at the end.
- Order of precedence. Which document takes precedence in the event of a conflict between the framework, the further assignment, and any general terms and conditions.
Ranking and purchase obligation
Two provisions deserve special attention, as they are where most conflicts arise. The first is the order of precedence. A subsequent order may deviate from the framework, for example with a different price or delivery time for an urgent order. Without an order of precedence, it is unclear which condition applies. It is customary for the subsequent order to take precedence over the specific delivery, while the framework remains leading for the general parameters. Include this choice explicitly.
The second is the purchase obligation. By default, a window does not create an obligation to purchase; the obligation to supply only arises upon a placed and accepted order. This is convenient for the client, but it lacks volume certainty for the supplier. Anyone wishing to offer the supplier something can include a minimum purchase requirement, exclusivity, or a reservation fee. Be explicit about this, as a vaguely formulated intention will later lead to disputes regarding whether or not purchase was required.
Multiple suppliers and mini-competition
If you work with more than one supplier under the same window, you must establish how assignments are distributed. With a fixed ranking, the top supplier is offered each assignment first; if they cannot deliver, the assignment is passed on. In a mini-competition, you request a short quotation from all window suppliers for each assignment and award it to the best offer at that moment. Establish the applicable procedure, the criteria for a mini-competition, and the timeframe within which suppliers must respond.
A catering company enters into the same framework agreement with two regular meat suppliers, including agreed quality requirements and payment terms. For every large order, the buyer sends both suppliers the same request for proposals and awards the contract to the lowest price per kilo for that week. Because the allocation system and response time are specified in the framework, each supplier knows in advance how the awarding process works, and pricing remains competitive.
Honest recommendation
For a simple purchasing relationship with a single supplier and limited risk, you do not need a lawyer. A clear model with fixed rates, delivery times, and a short ranking mechanism is often sufficient, provided you consciously arrange the purchase obligation. As soon as you work with multiple suppliers, wish to include a mini-competition or exclusivity, or if larger amounts and liability risks are involved, it pays to have the framework drafted or reviewed. It is precisely the connection between the framework and the subsequent order, and the distribution system, that are the areas where an error proves costly later on.
Want to read more? View the framework agreement on our contracts page, first take your time to read what a framework agreement is and see what it costs to have a framework agreement drafted .
Frequently Asked Questions
In two layers. You establish the fixed conditions in the framework and create a concise model for the detailed assignment, which you use for purchasing on a case-by-case basis. In the framework, you regulate price, quality, delivery times, liability, duration, and ranking; the detailed assignment contains only the variable work.
Subject matter and scope, price and indexation, whether or not there is a purchase obligation, quality and inspection, delivery times, liability, confidentiality, term and termination, and a ranking arrangement. In the case of multiple suppliers, also the allocation system.
That is up to you to decide. By default, a window does not create a purchase obligation; the obligation to deliver only arises upon a placed and accepted order. If the supplier requires volume certainty, you must explicitly include a minimum purchase quantity, exclusivity, or a reservation fee.
A ranking arrangement determines which document takes precedence in the event of a conflict between the framework, the detailed order, and the general terms and conditions. It is customary for the detailed order to take precedence over the specific delivery and the framework over the general framework. Without such an arrangement, disputes regarding price or delivery time would arise.
You close the same window with every supplier and determine how contracts are distributed: via a fixed ranking or via a mini-competition per contract. Include the comparison criteria and the response period so that the awarding process is predictable for everyone.
You need to arrange that. Include a run-off clause stating that orders already placed and accepted will be completed under the terms of the framework, even after termination. Without that agreement, uncertainty arises regarding work that is already in progress.
For a simple relationship with a single supplier and limited risk, a good model suffices. However, as soon as multiple suppliers, a mini-competition, exclusivity, or significant liability risks are involved, it is advisable to have the window designed or inspected, as that is where the connection is most sensitive.